1151 Sammamish Rd, Issaquah, WA 98027 is a 8,520 ft² property built in 1997 on a 1.176 acre lot with 89 construction permits. This property is currently off market, and it was last sold in 1994.

Permits

1151 Sammamish Rd has 89 permit records.

Permit History
89
Permits
May 24, 2023
Project Name: Pse Potelco 1801 12th Ave NW 101140084Description: Pse potelco 1801 12th ave nw 101140084, this permit is for work outside of the city's project area necessary to complete electrical work. This work will be done nights on 5/30 5/31 and 6/8 although there may be minor adjustments to the schedule for unforeseen circumstances. &quot12th avenue nw and sr900/17th ave nw improvement project&quot. The city pm is jim jacobe please rush due to this being part of a city projectStatus: plancheckType: Right of wayBusiness Name: Potelco INCFees: $1,563Effective Date: 2023-05-24Permit Number: ROW23-00044
May 23, 2023
Project Name: Fairfield Hotel Backflow AssemblyDescription: Fairfield hotel backflow assembly, a (new) (backflow assembly) project involving 2 number of devicesStatus: issuedType: plumbingBusiness Name: Golddiggers Trkng &exvtng INCFees: $163Effective Date: 2023-05-23Permit Number: PLM23-00048
May 17, 2023
Project Name: Fairfield IssaquahDescription: Fairfield issaquah, install new fire alarm system for existing hotelStatus: finalType: FireBusiness Name: Western States Fire Prtctn COFees: $1,859Effective Date: 2023-05-17Permit Number: FIR22-00137
April 5, 2023
Project Name: Landscaping FairfieldDescription: Landscaping fairfield, removing old landscaping and adding new. No existing trees will be removed. Only small bushes and shrubberyStatus: plancheckType: LandscapeBusiness Name: Julian Builders INCFees: $3,704Effective Date: 2023-04-05Permit Number: LAN23-00004
March 27, 2023
Project Name: Fairfield Fire Sprinkler SupplyDescription: Fairfield fire sprinkler supply, water supply from main to retrofit fire sprinkler system including dcda fdc piv and service lineStatus: plancheckType: Site workBusiness Name: Golddiggers Trkng &exvtng INCFees: $933Effective Date: 2023-03-27Permit Number: SW23-00013
March 22, 2023
Project Name: Fairfield ReimageDescription: Fairfield reimage, building remodel by others. Remove (1) monument sign and (1) directional sign. Install (3) channel lettersets (1) pin mount letterset and (2) monument signsStatus: issuedBusiness Name: Phoenix Sign Company INCFees: $2,696Effective Date: 2023-03-22Permit Number: SGN22-00030
March 13, 2023
Project Name: Pioneer Square LabsDescription: Pioneer square labs, addition and relocate sprinklers as required for new walls and ceilingsStatus: issuedType: FireBusiness Name: Fire Sprinklers IncorporatedFees: $399Effective Date: 2023-03-13Permit Number: FIR23-00003
March 13, 2023
Project Name: Felix & FidoDescription: Felix & fido, install of two (2) sets of channel letters on frame system. Sign will be led illuminatedStatus: plancheckBusiness Name: Contractor UnknownFees: $607Effective Date: 2023-03-13Permit Number: SGN23-00007
February 23, 2023
Project Name: Tovah Issaquah Hotel LLC MechanicalDescription: Tovah issaquah hotel LLC mechanical, a (mixed use) (alteration) project involving 2 heat pump the work does not involve ventilation for a nail or hair salon the work does not involve ductwork the work does not involve ducts and diffusers the work does not involve diffusersStatus: finalType: MechanicalBusiness Name: Frost Heating &cooling LLCFees: $344Effective Date: 2023-02-23Permit Number: MEC23-00008
February 15, 2023
Project Name: Pioneer Square LabDescription: Pioneer square lab, the project consists of a remodel to an existing tenant space for use as a veterinary clinic. Minor exterior work to include addition of a door opening. Interior renovations to include removal of non-bearing partition and replacement with metal stud wall partitions gyp. Wallboard millwork flooring acp ceiling system and modification of electrical mechanical and plumbing systemsStatus: issuedType: BuildingBusiness Name: DP INC General ContractorsFees: $14,497Effective Date: 2023-02-15Permit Number: BLD22-00174
February 15, 2023
Project Name: FAIRFIELDINNDescription: F a I r f I e l d I n n, duct work onlyStatus: appliedType: MechanicalBusiness Name: Frost Heating &cooling LLCEffective Date: 2023-02-15Permit Number: MEC23-00097
February 10, 2023
Project Name: Holiday Inn Re RoofDescription: Holiday inn re roof, tear-off and re-roof. We will remove existing roof system down to the deck. Install single layer 1/4in dens deck mechanically fastened per manufacturers specs. Single layer 60 mil tpo mechanically fastened per manufacturers specs. 20 year material and labor warrantyStatus: issuedType: BuildingBusiness Name: Centimark CorporationFees: $15,682Effective Date: 2023-02-10Permit Number: BLD22-00215
February 3, 2023
Project Name: Lippe Construction - Matt Stevens MechanicalDescription: Lippe construction - matt stevens mechanical, a (nonresidential) (repair or replacement) project involving 2 gas - water heater the work does not involve ventilation for a nail or hair salon the work does not involve ductwork the work does not involve ducts and diffusers the work does not involve diffusersStatus: finalType: MechanicalBusiness Name: Green House Plumbing LLCFees: $242Effective Date: 2023-02-03Permit Number: MEC23-00037
December 4, 2022
Project Name: Fairfield Rtu ReplacementDescription: Fairfield remote terminal unit replacement, replace (6) remote terminal unit like-for-likeStatus: plancheckType: MechanicalBusiness Name: Mechanical &control Srvcs INCFees: $3,852Effective Date: 2022-12-04Permit Number: MEC22-00720
October 18, 2022
Project Name: Comcast - Jb0000569235Description: Comcast - jb0000569235, - tie in to existing splice case sp.wais.0146 - extend existing hardline coax - proof & pull (1) hardline coax through existing riser- proof & pull (1) hardline coax through existing conduit- dig & intercept existing 2&quot conduit & overset (1) new 233 mh- vac trench & extent (1) 2&quot conduit to new 17&quotx30&quot vault- set (1) new 17&quotx30&quot vault - upgrade existing dh/th to 3030la. - splice new coax back to original design - wreck out existing 2&quot conduit & coax. - upgrade existing vault to b48 vaultStatus: finalType: Right of wayBusiness Name: Cannon Construction LLCFees: $5,083Effective Date: 2022-10-18Permit Number: ROW22-00028
September 6, 2022
Project Name: Fairfield/marriottDescription: Fairfield/marriott, retrofit existing hotel with new nfpa 13 fire sprinkler systemStatus: issuedType: FireBusiness Name: Modern Fire Protection LLCFees: $2,184Effective Date: 2022-09-06Permit Number: FIR22-00096
July 14, 2022
Project Name: Fairfield Inn - Hotel RenovationDescription: Fairfield inn - hotel renovation, site and building information this project proposes improvements to the existing holiday inn located at 1801 12th ave nw issaquah wa. In order to convert into a fairfield inn by marriott. This existing 2-story hotel is of type v-b construction with a mix of masonry steel frame and metal stud construction with concrete slab at the ground floor and second floor. As requested by the city of issaquah we have merged our (3) previously submitted plan review packages into a single set. This will be a phased project that has been separated into exterior improvements lobby improvements and guest room improvementsStatus: issuedType: BuildingBusiness Name: Julian Builders INCFees: $28,794Effective Date: 2022-07-14Permit Number: BLD21-00048
June 29, 2022
Project Name: Qwest PERMIT_N.829928_1801 12th Ave NWDescription: Qwest permit_n.829928_1801 12th ave nw, n.829928_lumen to access mh1850 hh1801 existing ped install new pvc conduit from mh1850 to hh1801 in joint utility trench install pvc conduit from hh1801 south to existing ped and replace cover of hh1801 with new non skid ada compliant cover as well as raising it to gradeStatus: issuedType: Right of wayBusiness Name: Qwest CorporationFees: $4,961Effective Date: 2022-06-29Permit Number: ROW22-00034
June 17, 2022
Project Name: Pse Potelco 1801 12th Ave NW 105097565Description: Pse potelco 1801 12th ave nw 105097565, installation of new streetlights and secondary circuitry in developer provided sono-tubes and conduit. Sites sl1 - sl2. See work sketch. Please notify isabel diaz of permit submittal she had been working with PMStatus: issuedType: Right of wayBusiness Name: Potelco INCFees: $4,961Effective Date: 2022-06-17Permit Number: ROW22-00004
February 22, 2022
Project Name: Pse Ifs 1801 12th Ave NW 109138300Description: Pse ifs 1801 12th ave nw 109138300, crew to relocate two 2&quot pe gas mains test and tying 2 services as shown on designStatus: issuedType: Right of wayBusiness Name: Infrasource Services LLCFees: $5,591Effective Date: 2022-02-22Permit Number: ROW22-00003
November 17, 2021
Project Name: Comcast-jb0000569235Description: Comcast-jb0000569235, dig & intercept existing 2&quot conduit & overset (1) new 233 mh - directional drill (1) 2&quot conduit onto private property. - splice new coax back to original design - wreck out existing 2&quot conduit & coax. -upgrade existing dh/th to 3030la. -upgrade existing vault to b48 vault. -pull (1) new hardline and splice back to designStatus: issuedType: Right of wayBusiness Name: Cannon Construction LLCFees: $4,778Effective Date: 2021-11-17Permit Number: ROW21-00106
June 21, 2021
Project Name: 12th Ave NW & Sr900 ImprovementsDescription: 12th ave nw & sr900 improvementsStatus: issuedEffective Date: 2021-06-21Permit Number: STRT21-00001
April 27, 2021
Project Name: 17th Ave NW ImprovementsDescription: 17th ave nw improvements, aps to pothole at 5 locations to obtain depth and location for design purposesStatus: issuedType: Right of wayBusiness Name: Applied Professional Svcs INCFees: $420Effective Date: 2021-04-27Permit Number: ROW21-00032
November 13, 2020
Project Name: Holiday Inn plumbingDescription: Holiday inn plumbing, a (nonresidential) (alteration) project involving 2 pressure reducing valve - plumbingStatus: canceledType: plumbingBusiness Name: Vital Mechanical Service INCFees: $53Effective Date: 2020-11-13Permit Number: PLM19-00140
September 2, 2020
Project Name: 1151 NW Sammamish RecoverDescription: 1151 nw sammamish recover, pvc mechanically attached systems 1. Tear off and dispose of base flashings along parapet wall and around curb penetrations to allow for the proper installation of the new roofing system. 2. Furnish and install a 0.5 inch secure shield recover board over the existing roof system and mechanically attach. This will maintain the existing fire rating for the new roof assembly. 3. Over the recover board furnish and install a new 60 mil reinforced pvc roof membrane and mechanically attach to the substrateStatus: expiredType: BuildingBusiness Name: Columbia Roofing &sheet MetalFees: $595Effective Date: 2020-09-02Permit Number: BLD20-00214
May 29, 2020
Project Name: Holiday Inn plumbingDescription: Holiday inn plumbing, a (nonresidential) (repair or replacement) project involving water line re-pipeStatus: expiredType: plumbingBusiness Name: Best Plumbing Group LLCFees: $53Effective Date: 2020-05-29Permit Number: PLM19-00060
March 4, 2020
Project Name: Holiday Inn MechanicalDescription: Holiday inn mechanical, a (nonresidential) (repair or replacement) project involving 4 water heater - tankless the work does not involve ventilation for a nail or hair salon ductwork does not penetrate fire rated walls ceilings or floors the work does not involve ducts and diffusers the work does not involve diffusersStatus: finalType: MechanicalBusiness Name: Vital Mechanical Service INCFees: $668Effective Date: 2020-03-04Permit Number: MEC20-00068
October 24, 2019
Project Name: Holiday Inn Tree RemovalDescription: Holiday inn tree removal, remove one (1) dead treeStatus: issuedType: TreeBusiness Name: Greenworx LLCEffective Date: 2019-10-24Permit Number: TRE19-00117
October 15, 2019
Project Name: PLEDGER MECHANICALDescription: Ledger mechanical, a (single family residential) (repair or replacement) project involving 1 gas - water heaterStatus: finalType: MechanicalBusiness Name: Fast Water Heater CompanyFees: $53Effective Date: 2019-10-15Permit Number: MEC19-00504
January 4, 2019
Project Name: Holiday Inn Issaquah - Elevator Addition - TescDescription: Holiday inn issaquah - elevator addition - tesc, tesc onlyStatus: finalType: Public worksBusiness Name: RC Zeigler CO INCFees: $1,393Effective Date: 2019-01-04Permit Number: PUB14-00001
November 28, 2018
Project Name: Olympic Hot Tub Row (sidewalk)Description: Olympic hot tub row (sidewalk), install illuminated wall sign for olympic hot tub with 30 tall articulating lift situated in sidewalk to perform the work. Work to take approx 6 hours on 1 business day during off-peak travel time 9am-3pm. Sidewalk to be closed and pedestrians detoured around work site vehicle travel lane and bike path to be maintainedStatus: finalType: Right of wayBusiness Name: City Lites Neon INCFees: $315Effective Date: 2018-11-28Permit Number: ROW18-00148
November 13, 2018
Project Name: Olympic Hot Tub plumbingDescription: Olympic hot tub plumbing, a (nonresidential) (alteration) project involving 3 back flow preventerStatus: finalType: plumbingBusiness Name: Loyal Mechanical INCFees: $223Effective Date: 2018-11-13Permit Number: PLM18-00238
November 13, 2018
Project Name: Olympic Hot Tub TiDescription: Olympic hot tub tenant improvement, interior tenant improvement to an existing tenant space of an existing 1-story retail building for retail use to include minor demolition new construction of interior partitions doors casework and lightingStatus: finalType: BuildingBusiness Name: Powell Construction COFees: $3,374Effective Date: 2018-11-13Permit Number: BLD18-00146
October 29, 2018
Project Name: Olympic Hot Tub. Azose Properties Fire Sprinkler SystemsDescription: Olympic hot tub. Azose properties fire sprinkler systems, a (alteration) (fire sprinkler systems) project involving this is a modification or addition to an existing system nfpa 13 this is not a change of use there is no change to the hydraulic calculations the space is classified as light/ordinary hazard 25 or less total heads 23 number of heads relocated 23 number of quick response heads mains or cross mains are not being relocated 23 number of total headsStatus: finalType: FireBusiness Name: Archer Construction INCFees: $116Effective Date: 2018-10-29Permit Number: FIR18-00100
December 28, 2017
Project Name: Holiday Inn MechanicalDescription: Holiday inn mechanical, a (nonresidential) (repair or replacement) project involving 2 gas - water heater the work does not involve ventilation for a nail or hair salon the work does not involve ductwork the work does not involve ducts and diffusers the work does not involve diffusersStatus: expiredType: MechanicalBusiness Name: Washington Energy Svcs CO LLCFees: $57Effective Date: 2017-12-28Permit Number: MEC16-00507
June 28, 2016
Project Name: Holiday Inn Re-roofDescription: Holiday inn re-roof, removing all roofing and installing new torch down roof over the existing ridged insulation if any. Subject to field inspectionStatus: finalType: BuildingBusiness Name: Anderson Roofing INCFees: $1,618Effective Date: 2016-06-28Permit Number: BLD15-00290
October 14, 2015
Project Name: Holiday Inn Fire Alarm TransmitterDescription: Holiday inn fire alarm transmitter, a (alteration) (fire alarm transmitter) project involving cellularStatus: finalType: FireBusiness Name: Fire Chief EquipmentFees: $116Effective Date: 2015-10-14Permit Number: FIR15-00211
June 11, 2015
Project Name: Centurylink - Holiday Inn - Wo #E.610967Description: Centurylink - holiday inn - wo #e.610967, work proposes the placement of (1) 4-inch duct via directional bore starting @ existing ctl manhole located @ the nw corner of 11th ave nw & lake dr going west 750 ft on lake dr and going north on the west side of 12th ave nw for 300 ft ending @ 1801 12th ave 3/7/14: revision: using existing conduit where availableStatus: finalType: Right of wayBusiness Name: Pacific UtilityFees: $420Effective Date: 2015-06-11Permit Number: ROW14-00011
February 2, 2015
Project Name: Holiday Inn Issaquah - Elevator AdditionDescription: Holiday inn issaquah - elevator addition, 142 sf addition to the west facade of existing building including elevator hoistway floor extension at the second and main level and new overhead roof housing the shaft. New elevator machine room will occupy the existing pool equipment room. Mechanical and electrical drawings will be a deferred submittal by contractor with permission from building officialStatus: finalType: BuildingBusiness Name: RC Zeigler CO INCFees: $4,734Effective Date: 2015-02-02Permit Number: BLD13-00369
March 11, 2014
Project Name: Metro E-jt #97790Description: Metro e-jt #97790, tie into existing splice case. Proof existing conduit and pull (1) 12ct fiber cable through - 1233Status: finalType: Public worksBusiness Name: Horizon Communications INCFees: $101Effective Date: 2014-03-11Permit Number: PUB13-00286
July 18, 2013
Project Name: Holiday Inn Tree RemovalDescription: Holiday inn tree removal, remove (4) significant treesStatus: issuedType: TreeFees: $243Effective Date: 2013-07-18Permit Number: TRE13-00057
July 14, 2013
Project Name: HOLIDAY INN WATER LINE REPAIRDescription: Holiday inn water line repair, repair water line between meter and buildingStatus: expiredType: plumbingBusiness Name: Rescue RooterFees: $41Effective Date: 2013-07-14Permit Number: PLM11-00059
July 23, 2010
Project Name: Holiday Inn Water Line RepairDescription: Holiday inn water line repair, repair water line at holiday innStatus: finalType: plumbingBusiness Name: Lloy Enterprises INCFees: $38Effective Date: 2010-07-23Permit Number: PLM09-00052
May 21, 2010
Description: Project name: holiday inn signs remove existing holiday inn signage; install & wire 1 new directional sign (includes new foundation); install & wire 1 new pylon sign (includes new foundation); install & wire 1 set of holiday inn led channel letters wall sign w/monogram logo. *see drawingsStatus: FINALEDType: FoundationBusiness Name: INSIGNIA SIGN INCFees: $454Effective Date: 2010-05-21Permit Number: SGN10-00160
May 20, 2010
Description: Project name: colliers intl re sign temporary real estate sign for colliers international. Sign faces 12th ave NWStatus: PERM EXPIREDType: SgnBusiness Name: ADVANCED SIGN DESIGNFees: $25Effective Date: 2010-05-20Permit Number: SGN10-00159
January 23, 2010
Project Name: Holiday InnDescription: Holiday inn, replacing leaking copper plumbing systemStatus: finalType: plumbingBusiness Name: Holloway Radiant Floor & HEFees: $38Effective Date: 2010-01-23Permit Number: PLM09-00001
June 15, 2008
Status: canceledType: MechanicalBusiness Name: Washington Energy ServicesFees: $55Effective Date: 2008-06-15Permit Number: E07-08001
June 15, 2007
Project Name: Ih Div 2n Lot 15Description: Ih div 2n lot 15, new single family home w/detached garage plan a-3. Includes dcva for irrigation using 1 watts 775qtStatus: finalType: Public worksBusiness Name: Northward HomesFees: $772Effective Date: 2007-06-15Permit Number: PUB01-00051
February 27, 2007
Project Name: Holiday Inn Re-roofDescription: Holiday inn re-roof, re-roof. For holiday innStatus: finalType: BuildingBusiness Name: 3D RoofingFees: $523Effective Date: 2007-02-27Permit Number: BLD05-00671
July 5, 2006
Project Name: Holiday Inn LandscapeDescription: Holiday inn landscape, clear unsightly areas in sw corner of property as well as around pool area including 3 trees removed in sw corner and 6 trees removed in pool area. Areas to be replanted and updated for more aesthetic appeal to hotel in sw corner. Soil will be bermed up in proposed areas 2 in height landscape rocks will be placed and 2 tall planter box will be installed for future projectStatus: finalType: Admn site dev permitFees: $325Effective Date: 2006-07-05Permit Number: PLN06-00043
May 4, 2006
Project Name: Holiday Inn Fitness RoomDescription: Holiday inn fitness room, expired addition of 341 sf fitness room on west side adjacent to pool deck. Portion of pool deck removed for o net gain in imperviousStatus: expiredType: BuildingBusiness Name: InvalidFees: $329Effective Date: 2006-05-04Permit Number: BLD04-00678
November 2, 2005
Project Name: Holiday InnDescription: Holiday inn, replace prvStatus: finalType: plumbingBusiness Name: AndersonFees: $36Effective Date: 2005-11-02Permit Number: PLM05-00030
February 6, 2004
Project Name: Holiday Inn Fire SuppressionDescription: Holiday inn fire suppression, removal of existing dry chemical suppression system (in kitchen hood). Installation of ul300 standard wet chemical suppression system. Holiday innStatus: finalType: FireBusiness Name: Fire Chief EquipmentFees: $150Effective Date: 2004-02-06Permit Number: FIR03-00063
January 1, 2004
Project Name: Holiday Inn Rtu RelocationDescription: Holiday inn remote terminal unit relocation, relocation of remote terminal unit duct gas pipe for holiday innStatus: finalType: MechanicalBusiness Name: AIR Systems EngineeringFees: $71Effective Date: 2004-01-01Permit Number: MEC03-00046
June 3, 2002
Project Name: Holiday InnDescription: Holiday inn, expired minor demolition and improvements associated with relocation of pool equipment and installation of a new elevatorStatus: expiredType: BuildingBusiness Name: InvalidEffective Date: 2002-06-03Permit Number: BLD01-00183
March 27, 2002
Project Name: Ih Div 2b Lot 15Description: Ih div 2b lot 15, ih div 2b lot 15. New single family home w/detached garage plan a-3 see bld00-01001/1002 for (registered) plan setStatus: finalType: BuildingBusiness Name: Northward HomesFees: $2,923Effective Date: 2002-03-27Permit Number: BLD01-00071
January 17, 2002
Project Name: Holiday InnDescription: Holiday inn, 1, 000 sf tear out replace asphalt tar cracks; reseal parking lot 41, 459 sf. Restripe parking lot. Holiday innStatus: finalType: Public worksFees: $290Effective Date: 2002-01-17Permit Number: SUP98-00085
January 16, 2002
Project Name: Holiday InnDescription: Holiday inn, patch north parking lot approx. Square foot 30'x100. Holiday innStatus: finalType: Public worksFees: $290Effective Date: 2002-01-16Permit Number: SUP97-01863
January 16, 2002
Project Name: Tovah Retail CenterDescription: Tovah retail center, pre load for the construction of 2 new retail bldgs (13, 200 sf total), ref: bld96-0101Status: finalType: Public worksFees: $7,039Effective Date: 2002-01-16Permit Number: PUB96-00057
January 16, 2002
Project Name: Tovah Retail CenterDescription: Tovah retail center, construct 2 new retail bldgs (13, 200 sf total) with 61 parking stallsStatus: finalType: Public worksFees: $14,757Effective Date: 2002-01-16Permit Number: PUB96-00042
January 11, 2002
Project Name: Holiday InnDescription: Holiday inn, like for like change out of 2. 100 gallon gas water heaters. For the holiday innStatus: finalType: plumbingBusiness Name: Washington Energy ServicesFees: $34Effective Date: 2002-01-11Permit Number: PLM01-00129
September 27, 2001
Project Name: Holiday Inn AdditionDescription: Holiday inn addition, expired alteration of two rooms for a fitness center and business suite. Also addition of two rooms at southwest corner of building. See con99-00027 for concurrancy. Addition 946 SQ.FT with firesprinklersStatus: expiredType: BuildingFees: $1,775Effective Date: 2001-09-27Permit Number: BLD99-00167
September 27, 2001
Project Name: Holiday Inn AdditionDescription: Holiday inn addition, expired two guest rooms converted into a fitness center and adjacent business suite. Addition of 2 new rooms at sw corner of building. Ref bld99-00167Status: expiredType: Public worksFees: $1,392Effective Date: 2001-09-27Permit Number: PUB99-00069
October 6, 1999
Project Name: Holiday InnDescription: Holiday inn, install 2 boilersStatus: finalType: MechanicalFees: $78Effective Date: 1999-10-06Permit Number: MEC99-00087
April 5, 1999
Project Name: Comfort Air LtdDescription: Comfort air ltd, new ducts diffusers controlsl. Comfort air ltdStatus: finalType: MechanicalFees: $51Effective Date: 1999-04-05Permit Number: MEC97-00033
January 20, 1999
Project Name: Holiday InnDescription: Holiday inn, reroof over existing bur and insulation. Holiday innStatus: finalType: BuildingFees: $55Effective Date: 1999-01-20Permit Number: BLD97-00188
October 5, 1998
Project Name: Holiday InnDescription: Holiday inn, replace rooftop unit set in same location. New unit weighs less than existing and is no taller than existing unit. Holiday innStatus: finalType: MechanicalFees: $34Effective Date: 1998-10-05Permit Number: MEC98-00054
July 31, 1998
Project Name: Holiday InnDescription: Holiday inn, replace 4 4-ton rooftop HVAC units; gas piping. Holiday innStatus: finalType: MechanicalFees: $80Effective Date: 1998-07-31Permit Number: MEC98-00027
September 10, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, tovah retail center tully's: addition a storefront window in existing masonry wall on north end of building no. 2. Ref. Shell permit #b96-0101Status: finalType: BuildingFees: $309Effective Date: 1997-09-10Permit Number: BLD97-00101
September 3, 1997
Project Name: Holiday InnDescription: Holiday inn, holiday inn - addition storage room to existing dumpster enclosure at west end of siteStatus: finalType: BuildingFees: $293Effective Date: 1997-09-03Permit Number: BLD97-00099
August 8, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, tovah retail center - q point plumbing fixturesStatus: finalType: plumbingFees: $62Effective Date: 1997-08-08Permit Number: PLM97-00082
August 8, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, plumbing work related to caldwell banker in the tovah retail centerStatus: finalType: plumbingFees: $90Effective Date: 1997-08-08Permit Number: PLM97-00039
August 8, 1997
Project Name: Harley DavidsonDescription: Harley davidson, install one toilet one lavatory drain waste vent and trim. Harley davidson at tovah retailStatus: finalType: plumbingFees: $41Effective Date: 1997-08-08Permit Number: PLM97-00070
July 21, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, construct 2 new retail bldgs (13, 200 sf total) with 61 parking stalls. Building. I is q-point western wireless coldwell banker. Building. Ii is tulley's harley davidsonStatus: finalType: BuildingFees: $6,315Effective Date: 1997-07-21Permit Number: BLD96-00101
July 3, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, tenant improvement - building out walls 2 bathrooms and kitchen. Tovah retail center. Q-pointStatus: finalType: BuildingFees: $804Effective Date: 1997-07-03Permit Number: BLD97-00072
June 12, 1997
Project Name: Q Point MortgageDescription: Q point mortgage, q point mortgage - fire protection work to be done in accordance with submitted plansStatus: issuedType: plumbingFees: $33Effective Date: 1997-06-12Permit Number: PLM97-00088
May 30, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, tovah retail install fire sprinkler system in building. #1 and tully's in building. #2Status: issuedType: plumbingFees: $111Effective Date: 1997-05-30Permit Number: PLM97-00076
May 23, 1997
Project Name: Q PointDescription: Q point, install new ductwork and diffusers on existing rooftop package unit. Q point - tovah retailStatus: finalType: MechanicalFees: $35Effective Date: 1997-05-23Permit Number: MEC97-00052
May 21, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, install fire sprinklers in building. 1 & 2 for tovah retail ctrStatus: finalType: plumbingFees: $77Effective Date: 1997-05-21Permit Number: PLM97-00001
May 17, 1997
Project Name: Caldwell BankerDescription: Caldwell banker, install air distribution systems and exhaust fans. Caldwell bankerStatus: finalType: MechanicalFees: $74Effective Date: 1997-05-17Permit Number: MEC97-00035
May 5, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, installing 7 rooftop HVAC units. Ref bld96-00101. Tovah retail centerStatus: finalType: MechanicalFees: $151Effective Date: 1997-05-05Permit Number: MEC97-00025
April 28, 1997
Project Name: Holiday InnDescription: Holiday inn, re-locate existing ductwork diffuser t'statStatus: finalType: MechanicalFees: $41Effective Date: 1997-04-28Permit Number: MEC96-00045
January 14, 1997
Project Name: Tovah Retail CenterDescription: Tovah retail center, two sanitary sewer main stub outs and two domestic water stub outs for tovah retail centerStatus: issuedType: plumbingFees: $48Effective Date: 1997-01-14Permit Number: PLM97-00007
November 17, 1996
Project Name: Tovah - Holiday InnDescription: Tovah - holiday inn, plumbing for lounge remodel - subject to field inspectionStatus: finalType: plumbingFees: $55Effective Date: 1996-11-17Permit Number: PLM96-00082
October 27, 1996
Project Name: Tovah - Holiday InnDescription: Tovah - holiday inn, re-configure existing loungeStatus: finalType: BuildingFees: $1,530Effective Date: 1996-10-27Permit Number: BLD96-00085
October 14, 1996
Project Name: Tovah Retail CenterDescription: Tovah retail centerStatus: finalType: MechanicalEffective Date: 1996-10-14Permit Number: MEC96-00101
October 3, 1996
Project Name: Tovah - Holiday InnDescription: Tovah - holiday innStatus: finalType: Public worksEffective Date: 1996-10-03Permit Number: PUB99-00102
August 18, 1996
Project Name: Holliday InnDescription: Holliday inn, repair flood damage to original conditionStatus: finalType: BuildingEffective Date: 1996-08-18Permit Number: BLD96-00040
May 4, 1996
Project Name: Holiday InnDescription: Holiday inn, dcva for irrigation - 1 1/2 805yStatus: issuedType: plumbingFees: $40Effective Date: 1996-05-04Permit Number: PLM95-00151

Current Ownership

Information about the current owner(s).

Property History

1151 Sammamish Rd has undefined property events records (listings, deeds, permits, tax, foreclosure, loan).

Property Events

Environment

Environmental factors around 1151 Sammamish Rd

School Information

Public/private schools serving 1151 Sammamish Rd

Neighborhood

This property is located in I 90, Issaquah, WA 98027.

Market Trends

Historical market data near 1151 Sammamish Rd over selected time period.

Nearby Properties on Sammamish Rd