?
  • Chat with Us
  • Submit Feedback
  • TopHap Academy
  • What's New?
Other > Other
Off-Market
Sold Price
$--$--/ft²

3750 Brown Ave
Oakland, CA 94619

3750 Brown Ave, Oakland, CA 94619 is a property on a 3.498 acre lot with 5 construction permits. This property is currently off market.

Permits

3750 Brown Ave has 5 permit records.

Permit History
5
Permits
January 4, 2019
Description: Reserve 1 (25 ft.) non-metered parking space(s) in front of parcel only for parking. Post no-parking signs 72 hours prior in residential areas. No impact on traffic lane or sidewalk allowed. No-parking signs picked up by applicant after payment 4th floor. To have illegally parked vehicle ticketed call 510-777-3333. Applicant arranges towing. Comply with terms set forth in cvc section 22651 (m). For towed vehicle: call 510-777-3333. Tsd: 18-0467 12/26/18 - 1/2/19Status: expiredType: ObstructionFees: $655Effective Date: 2019-01-04Permit Number: OB1802564
December 23, 2018
Description: Reserve 4 non-metered parking space(s) in front of parcel only for dumpster construction vehicle moving van or storage pod. Post no-parking signs 72 hours prior in residential areas. No impact on traffic lane or sidewalk allowed. No-parking signs picked up by applicant after payment 4th floor. To have illegally parked vehicle ticketed call 510-777-3333. Applicant arranges towing. Comply with terms set forth in cvc section 22651 (m). For towed vehicle: call 510-238-3021Status: expiredType: ObstructionFees: $5,372Effective Date: 2018-12-23Permit Number: OB1801209
December 18, 2018
Description: Potholing on patterson st. Ensure that environmental controls are in place to prevent dust/debris/waste water from contaminating environment.if working within 25 feet of a monument you must comply with state law 8771 contact the inspector prior to starting excavation: minimum $5, 800.00 fine for non-compliance.comply with all terms of city of oakland public works standards street excavation rules revised march 2015 and city council ordinance no. 13300 C.M.S. Five day prior notice required for work lasting five days or less in business/commercial districts; 72 hour notice in residential districts. Ten day prior notice required for work lasting six days or more in all districts.call pwa inspection prior to start: 510-238-3651. Email pwa_inspections@oaklandnet.com. Comply with all terms conditions and restrictions stated in the traffic control plan. Any/all changes need prior written approval. Provide original traffic control plan at each renewalStatus: expiredType: Opw - excavationBusiness Name: MAR CON Builders INCFees: $527Effective Date: 2018-12-18Permit Number: X1801033
December 18, 2018
Description: Install new sewer lateral and excavate in public right-of-way. Overflow device may be needed. If working within 25 feet of a monument you must comply with state law 8771 contact the inspector prior to starting excavation: minimum $5, 800.00 fine for non-compliance. Comply with all terms of city of oakland public works standards street excavation rules revised march 2015 and city council ordinance no. 13300 C.M.S. Five days prior notice required for work lasting five days or less in business/commercial districts; 72 hour notice in residential districts. Ten days prior notice required for work lasting six days or more in all districts. Usa # and date must be provided in order to have a permit issued. Permit valid 90 days. Call pwa inspection prior to start: 510-238-3651 or email pwa_inspections@oaklandnet.com. Usa #w816500166-00w 12/06/18Status: finalType: Opw - sewer lateralBusiness Name: JC Green Plumbing INCFees: $1,219Effective Date: 2018-12-18Permit Number: SL1803157
December 18, 2018
Description: Note: ***before any work in right of way please call 510-238-3860 forty-eight hours in advance. Applicant is subject to fine if work is started without scheduling a pre-inspection*** install 1 sidewalk under-drain(s) per city standards. No structure allowed beyond property line w/o enmi. If working within 25 feet of a monument you must comply with state law 8771 contact the inspector prior to starting excavation: minimum $5, 800.00 fine for non-compliance. Comply with all terms of city of oakland public works standards street excavation rules revised march 2015 and city council ordinance no. 13300 C.M.S. Five day prior notice required for work lasting five days or less in business/commercial districts; 72 hour notice in residential districts. Ten day prior notice required for work lasting six days or more in all districts. Usa #Status: expiredType: Opw - curb gutter sidewalkBusiness Name: Jc Green plumbingIncFees: $474Effective Date: 2018-12-18Permit Number: CGS18266

Current Ownership

Information about the current owner(s).

Property History

3750 Brown Ave has undefined property events records (listings, deeds, permits, tax, foreclosure, loan).

Property Events

Environment

Environmental factors around 3750 Brown Ave

School Information

Public/private schools serving 3750 Brown Ave

Neighborhood

This property is located in Upper Laurel, Oakland, CA 94619.

Market Trends

Historical market data near 3750 Brown Ave over selected time period.

Nearby Properties on Brown Ave