?
  • Chat with Us
  • Submit Feedback
  • TopHap Academy
  • What's New?
Other > Other
Off-Market
Sold Price
$--$--/ft²

1108 Banner Rd
Julian, CA 92036

1108 Banner Rd, Julian, CA 92036 is a 1,892 ft² property built in 2006 on a 32.820 acre lot with 62 construction permits. This property is currently off market.

Permits

1108 Banner Rd has 62 permit records of total value of $3,613,945.

Permit History
62
Permits
$3,613,945
Total Permit Value
August 4, 2017
Description: Cross street: wynola rd description of work: hra (online permit) roof mount residential solar photovoltaic for existing single family dwelling (no meter upgrade). This permit does not exempt any existing structures from compliance with applicable building code and zoning ordinance requirements. Persection 4620 (i) of the zoning ordinance roof mounted photovoltaic systems shall not extend more than 5 ft. Above the highest point of the existing roofStatus: completeType: Residential alteration or addition - plan check-permitBusiness Name: Watts NEW Under THE SUN INCApplicant: Camp StevensEffective Date: 2017-08-04Permit Number: PDS2017-RESALT-006329
April 26, 2017
Status: completeType: Multi-permit site stormwater inspectionsBusiness Name: Larry Noble Construction INCEffective Date: 2017-04-26Permit Number: PDS2017-STMWTR-000006
April 26, 2017
Description: Cross street: whispering pines description of work: angel fire 2007 - rebuilding two buildings as follows for camp stevens: original buildings were 1860 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building: 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 1140 sq ft 4 unit cabin with bathroom AC/heat exterior stairs and balconyJob Value: $261,986Status: completeType: Commercial detached accessory structure - plan check-permitBusiness Name: Larry Noble Construction INCFees: $1,122Effective Date: 2017-04-26Permit Number: PDS2017-COMACC-000038
April 26, 2017
Description: Cross street: whispering pines description of work: angel fire 2007 - rebuilding two buildings as follows for camp stevens: original buildings were 1860 sq ft.(for this area in campground) building 2 - 2 story 1140 sf 4 unit cabins each with a full bathroom/heat and air conditioning exterior stairs and balconiesJob Value: $271,548Status: completeType: Commercial detached accessory structure - plan check-permitBusiness Name: Larry Noble Construction INCEffective Date: 2017-04-26Permit Number: PDS2017-COMACC-000039
May 25, 2016
Description: Cross street: whispering pines description of work: angel fire 2007 - rebuilding two buildings as follows for camp stevens: original buildings were 1860 sq ft.(for this area in campground) building 1 - 2305 sq ft 2 story building: 1165 1st floor meeting and conference rooms with 2 restrooms and laundry room storage and 2 drinking fountains and an attached 2 story 1140 sq ft 4 unit cabin with bathroom AC/heat exterior stairs and balcony building 2 - 2 story 1140 sf 4 unit cabins each with a full bathroom/heat and air conditioning exterior stairs and balconiesJob Value: $398,195Status: completeType: Commercial multi-building parent - plan checkBusiness Name: Larry Noble Construction INCFees: $1,180Effective Date: 2016-05-25Permit Number: PDS2016-CMASPC-000038
February 17, 2012
Description: Cross street: hwy 78 description of work:**2007 fire rebuild**rebuilding six cabins for camp stevens (cabins #10-14 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #12 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058Job Value: $13,824Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2012-02-17Permit Number: PDS2012-1019-20120021
February 17, 2012
Description: Cross street: hwy 78 description of work:**2007 fire rebuild**rebuilding six cabins for camp stevens (cabins #10-14 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #16 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058Job Value: $13,824Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2012-02-17Permit Number: PDS2012-1019-20120024
February 17, 2012
Description: Cross street: hwy 78 description of work:**2007 fire rebuild**rebuilding six cabins for camp stevens (cabins #10-14 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #10 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058Job Value: $13,824Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2012-02-17Permit Number: PDS2012-1019-20120019
February 17, 2012
Description: Cross street: hwy 78 description of work:**2007 fire rebuild**rebuilding six cabins for camp stevens (cabins #10-14 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #14 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058Job Value: $13,824Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2012-02-17Permit Number: PDS2012-1019-20120023
February 17, 2012
Description: Cross street: hwy 78 description of work:**2007 fire rebuild**rebuilding six cabins for camp stevens (cabins #10-14 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #13 -- 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058Job Value: $13,824Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2012-02-17Permit Number: PDS2012-1019-20120022
February 17, 2012
Description: Cross street: hwy 78 description of work:**2007 fire rebuild**rebuilding six cabins for camp stevens (cabins #10-14 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. Cabin #11 - 432 sqft 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058Job Value: $13,824Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2012-02-17Permit Number: PDS2012-1019-20120020
February 17, 2012
Description: Cross street: hwy 78 description of work:**2007 fire rebuild**rebuilding six cabins for camp stevens (cabins #10-14 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabinsJob Value: $13,824Status: completeType: Multi-permit site stormwater inspectionsEffective Date: 2012-02-17Permit Number: PDS2012-1014-20120001
January 11, 2012
Description: Area: whispering pines proposed use of graded site: camp emergency contact: john horton 760.765.0028 issuance of grading permit approved by k. Brazell dpw project manager on 8/10/11Status: completeType: ChangeBusiness Name: Patrick Engineering & SurveyEffective Date: 2012-01-11Permit Number: PDS2012-4701-15610
August 10, 2011
Project Name: Camp Stevens- JulianDescription: Area: whispering pines proposed use of graded site: camp emergency contact: john horton 760.765.0028 issuance of grading permit approved by k. Brazell dpw project manager on 8/10/11Status: completeType: Grading permit majBusiness Name: Patrick Engineering & SurveyFees: $34,334Effective Date: 2011-08-10Permit Number: PDS2011-4700-15610
March 17, 2011
Description: Cross street: hwy 78 description of work:**2007 fire rebuild**rebuilding six cabins for camp stevens (cabins #10-14 16) -- 432 sqft each (total of 2592 sqft). Fire rebuild credit for all six cabins. 4-3-2012 plan change structural to change product used for exterior cabin walls. Vam see c of a 1017-20110058Job Value: $16,874Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2011-03-17Permit Number: PDS2011-1017-20110058
March 10, 2011
Project Name: Camp StevensDescription: Landscape plan: standard permit difficulty: specific plan area: none description: LP for camp stevens l15610 & p84-007w2 dplu manager: dave kahler dpw trust: kronos account:Status: approvedType: Landscape planBusiness Name: Patrick Brown EngineeringFees: $1,694Effective Date: 2011-03-10Permit Number: PDS2011-3960-11-018
January 26, 2011
Description: Area: whispering pines proposed use of graded site: camp emergency contact: issuance of grading permit approved by xxx dpw project manager on xxStatus: completeType: Grading permit majBusiness Name: Patrick Engineering & SurveyFees: $8,342Effective Date: 2011-01-26Permit Number: PDS2011-2700-15610
January 25, 2011
Project Name: Camp StevensDescription: CAMP STEVENS Major Use Permit: Minor DeviationLinked cases: Permit Difficulty:Specific Plan Area:Description:DPW Manager:DPLU Manager:DPW Trust:DPLU KRONOS ACCOUNT: 1002785Status: triageType: Major use permit minor deviationEffective Date: 2011-01-25Permit Number: PDS2011-3301-84-007-02
January 25, 2011
Project Name: Camp StevensDescription: Camp stevensStatus: triageType: Major use permitEffective Date: 2011-01-25Permit Number: PDS2011-3300-84-007
January 25, 2011
Project Name: Camp StevensDescription: CAMP STEVENS Major Use Permit: Minor DeviationLinked cases: Permit Difficulty:Specific Plan Area:Description:DPW Manager:DPLU Manager:DPW Trust:DPLU KRONOS ACCOUNT: 1002785Status: triageType: Major use permit minor deviationEffective Date: 2011-01-25Permit Number: PDS2011-3301-84-007-03
September 23, 2010
Description: Cross street: wynola description of work: (2) roof mount commercial solar pv's no. Of modules: 24 + 16 = 40 no. Of inverters: 1 + 1 = 2 total system size in kilowatts: 5.5 + 3.6 = 9.1 per section 4620 (i) of the zoning ordinance roof mounted photovoltaic systems shall not extend more than 5 above the highest point of the existing roofStatus: completeType: Commercial alteration or addition - plan check-permitBusiness Name: Watts NEW Under THE SUNFees: $424Effective Date: 2010-09-23Permit Number: PDS2010-1031-20100711
January 6, 2010
Project Name: CAMP STEVENS, MUP MODIFICATION; P 84-007Description: Camp stevens mup modification; p 84-007 application for environmental initial study (aeis) - previous ceqa actionlinked cases: mpa 09-021 p 84-007w2permit difficulty:specific plan area: none description: major use permit modification for camp stevensdpw manager:dplu manager:dpw trust:dplu kronos account:Status: PC ApprovedType: CeqaBusiness Name: John Horton0Effective Date: 2010-01-06Permit Number: PDS2010-3910-8410001B
November 24, 2009
Description: Cross street: hwy 78 description of work: demolish existing 214 sqft bathroom 752 sqft addition to existing dining hall & minor remodel to existing dining hall create storage area & push out serving counter. Misc. Electrical. plumbing. & mechanical. For camp stevens 6-1-2010 plan change for door hardware (panic hardware (removal from unlocked doors) vamJob Value: $77,907Status: completeType: New primary commercial structure - plan check-permitApplicant: (camp Stevens)Fees: $1,631Effective Date: 2009-11-24Permit Number: PDS2009-1019-20090212
September 18, 2009
Description: Cross street: hwy 78 description of work: 2774 sqft 2 story lodge (6 rooms lax-saddler lodge) w air conditioning & fs 140 sq. Ft. Retaining wall with level backfill 200 amp service misc. Electrical plumbing & mechanical for camp stevens--unit ls designation 08/16/10 plan change to slope/ramp see c of a...dag/vmd 4/28/10: contractor to purchase temp power & added to permit per h. Boghossian...m1aJob Value: $305,071Status: completeType: New primary commercial structure - plan check-permitBusiness Name: Noble ConstructionApplicant: Camp StevensFees: $3,734Effective Date: 2009-09-18Permit Number: PDS2009-1019-20090168
July 8, 2009
Description: Cross street: hwy 78 description of work: grading for plan check 1017-20090024: (2774 sqft 2 story lodge (6 rooms) w air conditioning & fs 200 amp service misc. Electrical plumbing & mechanical for camp stevens)Job Value: $84,289Status: completeType: Pds minor residential grading - plan check-permitBusiness Name: Noble ConstructionFees: $900Effective Date: 2009-07-08Permit Number: PDS2009-1026-20090012
March 24, 2009
Description: Cross street: hwy 78 description of work: demolish existing 214 sqft bathroom 752 sqft addition to existing dining hall & minor remodel to existing dining hall create storage area & push out serving counter. Misc. Electrical. plumbing. & mechanical. For camp stevens 7/8/09: plan change see conditions of approval for details. 1srsJob Value: $77,907Status: completeType: New primary commercial structure - plan check-permitFees: $466Effective Date: 2009-03-24Permit Number: PDS2009-1017-20090051
February 19, 2009
Project Name: Camp Steven Major Pre-app WaiverDescription: Pre-application major meeting (no permit) permit difficulty: specific plan area: description: waiver for major pre-app received 2.19.09 dpw manager: dplu manager: alyssa maxson dpw trust: dplu kronos account:Status: rejectedType: Major pre-applicationEffective Date: 2009-02-19Permit Number: PDS2009-3992-09-016
February 9, 2009
Description: Cross street: hwy 78 description of work: 2774 sqft 2 story lodge (6 rooms) w air conditioning & fs 140 sq. Ft. Retaining wall with level backfill 200 amp service misc. Electrical plumbing & mechanical for camp stevensJob Value: $305,071Status: completeType: New primary commercial structure - plan check-permitBusiness Name: Noble ConstructionFees: $5,811Effective Date: 2009-02-09Permit Number: PDS2009-1017-20090024
January 5, 2009
Description: Cross street: hwy 78 description of work: electrical. Only to re-install modules to existing photovoltaic system (32 modules) hra original burned in angel fire **system not to extend more than 5 above existing roof**Status: completeType: Residential alteration or addition - plan check-permitBusiness Name: Watts NEW Under THE SUNEffective Date: 2009-01-05Permit Number: PDS2009-1030-20090006
July 11, 2008
Project Name: Camp Stevens, Minor Deviation, P84-007w1Description: Major use permit: minor deviation linked cases: p84-007 permit difficulty: specific plan area: camp stevens description: p84-007w1m5: the project is a minor deviation to the previously approved plot plan associated with major use permit modification p84-007w1. The project consists of increasing the occupancy of the previously approved not yet constructed new lax-sadler lodge from 12 to 24 and to reduce the occupancy of the live oak lodge from 20 to 12 which was lost to fire in september 2007 such that the total occupancy for the site will remain at less than 250 persons. Dpw manager: dplu manager: a. Griffith dpw trust: dplu kronos account: 1002785Status: DIR ApprovedType: Major use permit minor deviationBusiness Name: Protestant Episcopal Church inFees: $700Effective Date: 2008-07-11Permit Number: PDS2008-3301-84-007-09
May 21, 2008
Description: Cross street: hwy 78 description of work: firestorm 2007 *angel fire* rebuilding 432 sq ft girls cabin and 521 sq ft restroom. Original sq footages were 400 s f girls cabin and 480 sq ft restroom. *fees waived per cdw* misc electrical and plumbing. 5/4/09...permit renewed (no fees - fire rebuild)...vmt 6/9/08...plan change; see c of a...vmtJob Value: $29,475Status: completeType: New primary commercial structure - plan check-permitApplicant: Protestant Episcopal Church inFees: $69Effective Date: 2008-05-21Permit Number: PDS2008-1019-20080108
May 6, 2008
Description: Cross street: hwy 78 description of work: ***2007 fire streamline (angel fire)***three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft there is a regular floor plan and an ada floor plan each floor plan consists of a lodging area and a restroom. 100 amp service. Credit 1356 sqft per clay westling. Tent b: 452 sqft temporary tent. - 60 amp sub panelJob Value: $37,579Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2008-05-06Permit Number: PDS2008-1019-20080092
May 6, 2008
Description: Cross street: hwy 78 description of work: ***2007 fire streamline (angel fire)***three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft there is a regular floor plan and an ada floor plan each floor plan consists of a lodging area and a restroom. 100 amp service. Credit 1356 sqft per clay westling. Tent c: 452 sqft temporary tent. - this unit is ada compliant 60 amp subpanelJob Value: $37,579Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2008-05-06Permit Number: PDS2008-1019-20080093
May 6, 2008
Description: Cross street: hwy 78 description of work: ***2007 fire streamline (angel fire)***three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft there is a regular floor plan and an ada floor plan each floor plan consists of a lodging area and a restroom. 100 amp service. Credit 1356 sqft per clay westling. Tent a: 452 sqft temporary tent. 100 amp serviceJob Value: $37,579Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2008-05-06Permit Number: PDS2008-1019-20080091
April 22, 2008
Description: Cross street: hwy 78 description of work: firestorm 2007 *angel fire* rebuilding 432 sq ft girls cabin and 521 sq ft restroom. Original sq footages were 400 s f girls cabin and 480 sq ft restroom. *fees waived per cdw* misc electrical and plumbingJob Value: $29,475Status: completeType: New primary commercial structure - plan check-permitApplicant: Protestant Episcopal Church inEffective Date: 2008-04-22Permit Number: PDS2008-1017-20080075
March 4, 2008
Description: Cross street: hwy 78 description of work: ***2007 fire (angel fire)*** rebuilding 2020 sqft lodge consisting of 4 bedrooms 2 bathrooms and 1 living/sitting room; 166 sqft deck. Original sqft was 2020 sqft. P/c change to 400-amp remote main panel w sub-panelJob Value: $425,000Status: completeType: New primary commercial structure - plan check-permitFees: $61Effective Date: 2008-03-04Permit Number: PDS2008-1019-20080031
February 14, 2008
Description: Cross street: hwy 78 description of work: ***2007 fire streamline (angel fire)***three temporary housing tents for lax sadler lodge in camp stevens each tent is 452 sqft for a total of 1356 sqft there is a regular floor plan and an ada floor plan each floor plan consists of a lodging area and a restroom. 100 amp service. Credit 1356 sqft per clay westling. Tent a: 452 sqft temporary tent. 100 amp service. Tent b: 452 sqft temporary tent. Tent c: 452 sqft temporary tentJob Value: $112,738Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2008-02-14Permit Number: PDS2008-1017-20080045
January 4, 2008
Project Name: Camp Stevens, Mup, Minor DeviationDescription: Major use permit: minor deviation linked cases: p84-007w permit difficulty: specific plan area: none description: minor deviation to allow for temporary buildings. Mup 84-007 w1m3 the project is a mup modification to an existing campground. The project consists of providing temporary lodging or camp users by way of 3 platform tents @ 365 sf each on the site of one of the buildings (lax sadler lodge) destroyed in the september 15 2007 angel fire. The proposed 3 structures could house up to 36 persons the number of beds that were lost in the two buildings on or near the site (lax sadler and st. Mary's) that used the existing septic system.the project site is located on 1700sf (the total acreage of the campground is 256 acres) in the julian community planning group within unincorporated san diego county. The site is subject to the general plan regional category rural development area land use designation 18. Zoning for the site is a70. The site contains an existing parking facility that wStatus: DIR ApprovedType: Major use permit minor deviationBusiness Name: Protestant Episcopal Church inFees: $680Effective Date: 2008-01-04Permit Number: PDS2008-3301-84-007-07
November 19, 2007
Description: Cross street: hwy 78 description of work: ***2007 fire (angel fire)*** rebuilding 2020 sqft lodge consisting of 4 bedrooms 2 bathrooms and 1 living/sitting room; 166 sqft deck. Original sqft was 2020 sqftJob Value: $425,000Status: completeType: New primary commercial structure - plan check-permitEffective Date: 2007-11-19Permit Number: PDS2007-1017-20070214
October 4, 2007
Description: Cross street: sr 78 description of work: fire repair/rebuild portion of stair and upper level deck/walkway for blum lodge at camp stevens. Also rebuild handicapped accessible ramp per original. (damaged as a result of angel fire). ~~fees waived per cdw~~Job Value: $30,000Status: completeType: Commercial alteration or addition - plan check-permitBusiness Name: Noble ConstructionEffective Date: 2007-10-04Permit Number: PDS2007-1021-20070275
September 19, 2007
Description: Cross street: sr-78 description of work: replace electrical service destroyed by angel fire of 09/07. Service was 600 amps new service to be 200 amps and will serve dining hall only as other structures formerly fed by this service were destroyed. ~~building inspector: please call in release to sdge with notation that this is meter dh (for dining hall)Status: completeType: Residential alteration or addition - plan check-permitBusiness Name: Stonewall FramingEffective Date: 2007-09-19Permit Number: PDS2007-1007-20070653
April 23, 2007
Description: Cross street:highway 78 and whispering pines description of work: H.R.A. Roof mount photo voltaic system. 36 modules 1 inverter 5 kw for camp stevensStatus: completeType: Residential alteration or addition - plan check-permitBusiness Name: Borrego Solar SystemsEffective Date: 2007-04-23Permit Number: PDS2007-1030-20070379
April 23, 2007
Description: Cancelled - created in errorStatus: withdrawnType: Residential alteration or addition - plan check-permitBusiness Name: Borrego Solar SystemsEffective Date: 2007-04-23Permit Number: PDS2007-1007-20070294
November 9, 2006
Description: Cross street:highway 78 and whispering pines description of work: 1, 750 sq. Ft. 2-story administrative building for camp stevens. Building is type v-nr with a b occupancy. It consists of (first floor = 1, 057 sq. Ft.) (second floor = 693 sq. Ft.) copy room 2 storage rooms 1 work room 2 offices reception area 2 baths and converence room. Also includes 200 amp service temp power.-ded 2/13/06 note: this structure is designated as a'-ded 2/13/06 12-15-06 - structural plan change only - see conditions of approval vamJob Value: $125,125Status: completeType: Commercial alteration or addition - plan check-permitFees: $1,762Effective Date: 2006-11-09Permit Number: PDS2006-1019-20060278
October 2, 2006
Description: Cross street: whispering pine description of work: commercial or all other bldgs demolition permit -- as-built demolish of 1152 sqft old workshop building (not workshop permitted under 1019-20020001) note: _ it may not be possible to rebuild. _ the fact that there was an existing structure on your lot does not guarantee that you will be able to replace it if it is demolished. Existence of a structure does not grandfather its use if it is removed. Please see the zoning counter at the kearny mesa dplu offices (5201 ruffin road) for more informationStatus: expiredType: Residential alteration or addition - plan check-permitFees: $97Effective Date: 2006-10-02Permit Number: PDS2006-1005-20060878
February 13, 2006
Description: Cross street:highway 78 and whispering pines description of work: 1, 750 sq. Ft. 2-story administrative building for camp stevens. Building is type v-nr with a b occupancy. It consists of (first floor = 1, 057 sq. Ft.) (second floor = 693 sq. Ft.) copy room 2 storage rooms 1 work room 2 offices reception area 2 baths and converence room. Also includes 200 amp service temp power.-ded 2/13/06 note: this structure is designated as a'-ded 2/13/06Job Value: $125,125Status: completeType: Commercial alteration or addition - plan check-permitFees: $618Effective Date: 2006-02-13Permit Number: PDS2006-1017-20060034
November 1, 2005
Project Name: Camp StevensDescription: Major use permit: minor deviation linked cases: p84-007 description: relocating reception/administration building p84-007w1m2 dpw manager: dplu manager: wright gail dpw trust: dplu kronos account: 1002785 this minor deviation is for the relocationof the proposed new reception/administration building. The size shape construction and use of the building remains the same as previously approved by p 84-007w1. The only change is to move the building east/northeast 65 feet. It will use the same approved leach field. The proposed new location will make the new building about 40-feet from the nearest building a staff residence called st. Matthew's cabin. The nearest neighbor's property line is more than 1000 feet away. The reason for the change of location is that move the new building away from under power lines. Originally the utility lines were to be uderground. However the cost became prohibitiveStatus: approvedType: Major use permit minor deviationBusiness Name: Episcopal Diocese of Los AngelesFees: $3,401Effective Date: 2005-11-01Permit Number: PDS2005-3301-84-007-06
July 8, 2005
Description: Cross street: whispering pines description of work: building a - 1250 sq ft staff housing (duplex) with 48 sq ft porch with fire sprinklers for camp stevens (protestant episcopal church). See 1016-20050004 for all clearances. 11/1/05: adding temp power to permit (approved per pjh)...amcJob Value: $45,903Status: expiredType: New primary commercial structure - plan check-permitBusiness Name: California Yurts INCFees: $516Effective Date: 2005-07-08Permit Number: PDS2005-1019-20050187
July 8, 2005
Description: Cross street: whispering pines description of work: building a - 1250 sq ft staff housing (duplex) with 48 sq ft porch with fire sprinklers for camp stevens (protestant episcopal church). See 1016-20050004 for all clearances. Building b - 642 sq ft meeting hall with fs. For camp stevens (protestant episcopal church)Job Value: $108,235Status: completeType: New primary commercial structure - plan check-permitBusiness Name: California Yurts INCFees: $3,011Effective Date: 2005-07-08Permit Number: PDS2005-1019-20050186
February 28, 2005
Description: Cross street: whispering pines description of work: building a - 1250 sq ft staff housing (duplex) with 48 sq ft porch with fire sprinklers and building b - 642 sq ft meeting hall with fs. For camp stevens (protestant episcopal church)Status: completeType: Commercial multi-building parent - plan checkBusiness Name: California Yurts INCEffective Date: 2005-02-28Permit Number: PDS2005-1016-20050004
February 28, 2005
Description: Cross street: whispering pines description of work: building a - 1250 sq ft staff housing (duplex) with 48 sq ft porch with fire sprinklers for camp stevens (protestant episcopal church). See 1016-20050004 for all clearancesJob Value: $108,235Status: completeType: New primary commercial structure - plan check-permitBusiness Name: California Yurts INCFees: $573Effective Date: 2005-02-28Permit Number: PDS2005-1017-20050040
February 28, 2005
Description: Cross street: whispering pines description of work: building b - 642 sq ft meeting hall with fs. For camp stevens (protestant episcopal church)Job Value: $41,281Status: completeType: New primary commercial structure - plan check-permitBusiness Name: California Yurts INCFees: $272Effective Date: 2005-02-28Permit Number: PDS2005-1017-20050041
February 11, 2005
Project Name: Camp StevensDescription: Major use permit: minor deviation for staff housing and community center smaller than what was approved on the modification. P84-007-05 dpw manager: dplu manager: rosenberg daniella dplu analyst: version w1m1received 11-feb-2005 dpw trust: dplu trust:Status: approvedType: Major use permit minor deviationBusiness Name: Protestant Episcopal Church inFees: $550Effective Date: 2005-02-11Permit Number: PDS2005-3301-84-007-05
October 7, 2004
Description: Cross street: hwy 78 description of work:36 panel 2 inverter 5k roof mounted solar photo voltaic system (tied to grid) for camp stevens system will be mounted on bishop's lodge building(13) & run the dining hall building. (17). This system is less than 5 above existing roofStatus: completeType: Residential alteration or addition - plan check-permitBusiness Name: Borrego Solar SystemsEffective Date: 2004-10-07Permit Number: PDS2004-1030-20040747
February 18, 2004
Description: Office:sm cross street: sunshine tr description of work: misc electrical to existing poolStatus: completeType: Residential alteration or addition - plan check-permitBusiness Name: Mission PoolsFees: $124Effective Date: 2004-02-18Permit Number: PDS2004-1007-20040233
March 15, 2002
Description: Henson virgil dplu regional analyst: jpeterpl dplu analyst: acoultpl dplu regional planner: playbopl dplu planner: dsibbeplStatus: filedType: Major pre-applicationEffective Date: 2002-03-15Permit Number: PDS2002-3992-02-067
January 7, 2002
Description: Cross street: wynola rddescription of work:workshop finished w 100 amp service/exhaust fan/no plumbing (for existing church camp) customer to demolish existing structure and replaceStatus: CompletedType: New residential detached accessory structure - plan check-permitBusiness Name: Noble ConstructionEffective Date: 2002-01-07Permit Number: PDS2002-1019-20020001
August 28, 2001
Project Name: Log inDescription: Log in cross street: wynola rddescription of work:workshop finished w 100 amp service/exhaust fan/no plumbing (for existing church camp) customer to demolish existing structure and replaceStatus: CompletedType: Commercial detached accessory structure - plan check-permitBusiness Name: Noble ConstructionEffective Date: 2001-08-28Permit Number: PDS2001-1017-20010187
February 26, 2001
Description: Cross street: WHISPERING PINES DR. TB: 1136 B5Description of Work: 576 S.F. SHADE STRUCTURE FOR CAMP FACILITY. Add Solar Voltaic System mounted on Shade Structure 08/08/01. CIA per RLNStatus: CompletedType: Commercial Alteration or Addition - Plan Check-PermitEffective Date: 2001-02-26Permit Number: PDS2001-1021-20010057
April 14, 1992
Description: Cross street: banner gradedescription of work: lodge & meeting hall for camp stevensStatus: CompletedType: New primary commercial structure - plan check-permitEffective Date: 1992-04-14Permit Number: PDS1992-A-9200637999
January 31, 1992
Description: Cross street: whispering pinesdescription of work: m/h on perm fdn (staff housing for church camp)Status: CompletedType: New primary residential structure single family dwelling or mh - plan check-permitBusiness Name: Lsr HomesEffective Date: 1992-01-31Permit Number: PDS1992-C-92004241
January 27, 1992
Description: Cross street: whispering pinesdescription of work: m/h on perm fdn (staff housing for church camp)Status: CompletedType: New primary residential structure single family dwelling or mh - plan check-permitBusiness Name: Lsr HomesEffective Date: 1992-01-27Permit Number: PDS1992-A-9200133999

Current Ownership

Information about the current owner(s).

Property History

1108 Banner Rd has undefined property events records (listings, deeds, permits, tax, foreclosure, loan).

Property Events

Environment

Environmental factors around 1108 Banner Rd

School Information

Public/private schools serving 1108 Banner Rd

Neighborhood

This property is located in 92036.

Market Trends

Historical market data near 1108 Banner Rd over selected time period.

Nearby Properties on Banner Rd