?
  • Chat with Us
  • Submit Feedback
  • TopHap Academy
  • What's New?
Commercial > Office
Sold
08/31/2021
Sold Price
$79,473,500$618/ft²

1310 Harbor Bay Pkwy
Alameda, CA 94502

1310 Harbor Bay Pkwy, Alameda, CA 94502 is a 128,650 ft² commercial office property property built in 2021 on a 6.381 acre lot with 20 construction permits. This commercial office property is currently off market, and it was last sold in 2021 for $79,473,500.

Permits

1310 Harbor Bay Pkwy has 20 permit records of total value of $5,706,219.

Permit History
20
Permits
$5,706,219
Total Permit Value
September 13, 2022
Description: (pln22-0148) - install (1) s/f & (1) d/f non-illuminated panel sign with fco letters & logos; surface mount to (e) gabion wall penumbra install (2) non-illuminated directories with vinyl letters install (2) sets non-illuminated letters & logo penumbra; fco letters penumbra main lobby & freckles deli & cafeJob Value: $29,350Status: finalType: Commercial - miscellaneousBusiness Name: Arrow Sign COApplicant: Harbor Bay Ca, LLC C/o Gs Property ManagementFees: $3,460Effective Date: 2022-09-13Permit Number: B22-0200
August 23, 2021
Description: Building a - approx. 478 sf conc. Trash enclosure w mtl. Roof. (bldg e P.) **revision: relocate trash enclosure see plans permit cb19-0395 dmc 12/5/19** related permit cb19-0395: building a: proposed scope of work consists of new construction cold shell concrete site cast construction single story and mezzanine - 124, 190 sf occupancy b f1 construction type vb. (bldg/mech/elec/plumbing)Job Value: $18,479Status: finalType: Commercial - comboApplicant: South Loop, LLCFees: $4,997Effective Date: 2021-08-23Permit Number: CB19-0546
August 23, 2021
Description: *revision 4/30/2020 (dm) revisions related to underground scope of work pages g0.0-a g0.1-a e3.1 pa1 pa2 pa3 pa4 pa5 pa6 pa7 pa8 pa9 pa10 underground waste plan 1st fl west waste & vent 1st fl east waste & vent 2nd fl waste & vent 1st and 2nd fl h&c enlargements gas condensate & wmu plan roof plan building a: **revision: 2story building 1st floor: 64, 280 sf 2nd floor 64, 280 sf total 128, 560 sf - scope of work revised to omit mezzanine loading dock and (8) of the (9) grade doors. Revisions include addition of second floor addition of (2) restrooms on the first floor and (2) restrooms on the second floor (2) elevators (3) additional exit stairs for a total of (5) stairs electrical room on first floor revised addition of electrical room on second floor. Revision of building footprint openings on the exterior elevations on north south east and west elevations with additional egress doors and addition of sun shades on the south elevation. Valuation revised from $6, 631, 200 to $17, 825, Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $1,164Effective Date: 2021-08-23Permit Number: CB19-0395-REV1
August 23, 2021
Description: Building a: **revision: 2story building 1st floor: 64, 280 sf 2nd floor 64, 280 sf total 128, 560 sf - scope of work revised to omit mezzanine loading dock and (8) of the (9) grade doors. Revisions include addition of second floor addition of (2) restrooms on the first floor and (2) restrooms on the second floor (2) elevators (3) additional exit stairs for a total of (5) stairs electrical room on first floor revised addition of electrical room on second floor. Revision of building footprint openings on the exterior elevations on north south east and west elevations with additional egress doors and addition of sun shades on the south elevation. Valuation revised from $6, 631, 200 to $17, 825, 000 trash enclosure relocated and revised. (permit cb19-0546) dmc 12/5/19** proposed scope of work consists of new construction cold shell concrete site cast construction single story and mezzanine - 124, 190 sf occupancy b f1 construction type vb. (bldg/mech/elec/plumbing) related permit: cb19-054Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $1,734,499Effective Date: 2021-08-23Permit Number: CB19-0395
August 23, 2021
Description: Dbs1 - building a - roof hatch shop drawings & product data building a: **revision: 2story building 1st floor: 64, 280 sf 2nd floor 64, 280 sf total 128, 560 sf - scope of work revised to omit mezzanine loading dock and (8) of the (9) grade doors. Revisions include addition of second floor addition of (2) restrooms on the first floor and (2) restrooms on the second floor (2) elevators (3) additional exit stairs for a total of (5) stairs electrical room on first floor revised addition of electrical room on second floor. Revision of building footprint openings on the exterior elevations on north south east and west elevations with additional egress doors and addition of sun shades on the south elevation. Valuation revised from $6, 631, 200 to $17, 825, 000 trash enclosure relocated and revised. (permit cb19-0546) dmc 12/5/19** proposed scope of work consists of new construction cold shell concrete site cast construction single story and mezzanine - 124, 190 sf occupancy b f1 constructionJob Value: $400Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $491Effective Date: 2021-08-23Permit Number: CB19-0395-DBS1
August 23, 2021
Description: Site improvements building a: **revision: building footprint; parking; vehicle access to adjacent property; outdoor amenity space on south side; remove one deck on north side; relocate second deck/patio; relocate transformer. Valuation revised from $2, 578, 000 to $4, 536, 000 relocate trash enclosure (cbcb19-0456)dmc 12/5/19** **revise scope to include grading drainage & utilites. Added valuation $1, 546, 800; plus original scope valuation of $1, 031, 200 = $2, 578, 000 total valuation. Dmc 8/12/19** landscape/irrigation; parking including ada parking and signage; car chargers; ada pathways; exterior deck and boardwalk. (bldg elec.) site electrical - deferred submittal related permits: cb19-0395 -building a: new cold shell concrete site cast construction single story and mezzanine - 124, 190 sf occupancy b f1 construction type vb. Cb19-0546 trash enclosureJob Value: $4,536,000Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop LLCFees: $75,277Effective Date: 2021-08-23Permit Number: CB19-0445
August 23, 2021
Description: Rev1 - delta 37 - revised sheet g0.0-sa g0.1-sa g1.1-sa c2.1-a c5.1-a l1.01-a l1.1-a thru l1.4-a l2.1-a l2.2-a a1.1-sa a1.2-sa s2.01-a. Revised accessible access at trash enclosure & no parking striping in front. Gate added to patio revised detail for guard rail/fence at patio retaining wall at patio. Added bollards location & detail by trash enclosure. No change in job valuation cb19-0445 - site improvements building a: **revision: building footprint; parking; vehicle access to adjacent property; outdoor amenity space on south side; remove one deck on north side; relocate second deck/patio; relocate transformer. Valuation revised from $2, 578, 000 to $4, 536, 000 relocate trash enclosure (cbcb19-0456)dmc 12/5/19** **revise scope to include grading drainage & utilites. Added valuation $1, 546, 800; plus original scope valuation of $1, 031, 200 = $2, 578, 000 total valuation. Dmc 8/12/19** landscape/irrigation; parking including ada parking and signage; car chargers; ada pathways; exterJob Value: $616Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop LLCFees: $719Effective Date: 2021-08-23Permit Number: CB19-0445-REV1
August 23, 2021
Description: ***(03/17/2021 R.W.) rev1 - clouded delta 6 for architectural drawings; full set addressing updates to second floor west. Includes M.E.P. Revisions. No change in construction job valuation*** tenant improvement - (bldg a): 110, 000 sq ft non-structural: two-story building to include construction of offices conference rooms break rooms restroom & coffee bar.(bldg/mech/elec/plumbing)Job Value: $400Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: Srm ErnstFees: $699Effective Date: 2021-08-23Permit Number: CB20-0284-REV1
August 23, 2021
Description: Dbs3 - building a - steel roof ladder shop drawing dbs2 - building a - steel stair shop drawings & cals dbs1 - building a - roof hatch shop drawings & product data building a: **revision: 2story building 1st floor: 64, 280 sf 2nd floor 64, 280 sf total 128, 560 sf - scope of work revised to omit mezzanine loading dock and (8) of the (9) grade doors. Revisions include addition of second floor addition of (2) restrooms on the first floor and (2) restrooms on the second floor (2) elevators (3) additional exit stairs for a total of (5) stairs electrical room on first floor revised addition of electrical room on second floor. Revision of building footprint openings on the exterior elevations on north south east and west elevations with additional egress doors and addition of sun shades on the south elevation. Valuation revised from $6, 631, 200 to $17, 825, 000 trash enclosure relocated and revised. (permit cb19-0546) dmc 12/5/19** proposed scope of work consists of new construction cold shJob Value: $400Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $718Effective Date: 2021-08-23Permit Number: CB19-0395-DBS3
August 23, 2021
Description: ***(03/17/2021 R.W.) dbs1 - stair handrail shop drawings *** tenant improvement - (bldg a): 110, 000 sq ft non-structural: two-story building to include construction of offices conference rooms break rooms restroom & coffee bar.(bldg/mech/elec/plumbing)Job Value: $400Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: Srm ErnstFees: $491Effective Date: 2021-08-23Permit Number: CB20-0284-DBS1
August 23, 2021
Description: Rev2 - delta 36 - revised roof elevation & drainage dimensional revision stairs to coordinate design building dbs plans. Added sheet m6.2 & revised m2.3. Revised s2.3 a-1 s2.3 a-2 s3.2 s6.2. Revised p a-1 & p a-2. (b.m.p.) (same plan set as cb19-0546-rev1) *revision-1 4/30/2020 (dm) revisions related to underground scope of work pages g0.0-a g0.1-a e3.1 pa1 pa2 pa3 pa4 pa5 pa6 pa7 pa8 pa9 pa10 underground waste plan 1st fl west waste & vent 1st fl east waste & vent 2nd fl waste & vent 1st and 2nd fl h&c enlargements gas condensate & wmu plan roof plan building a: **revision: 2story building 1st floor: 64, 280 sf 2nd floor 64, 280 sf total 128, 560 sf - scope of work revised to omit mezzanine loading dock and (8) of the (9) grade doors. Revisions include addition of second floor addition of (2) restrooms on the first floor and (2) restrooms on the second floor (2) elevators (3) additional exit stairs for a total of (5) stairs electrical room on first floor revised addition of electricalJob Value: $616Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $858Effective Date: 2021-08-23Permit Number: CB19-0395-REV2
August 23, 2021
Description: Dbs4 - building a - mechanical roof screen shop drawing & cals dbs3 - building a - steel roof ladder shop drawing dbs2 - building a - steel stair shop drawings & cals dbs1 - building a - roof hatch shop drawings & product data building a: **revision: 2story building 1st floor: 64, 280 sf 2nd floor 64, 280 sf total 128, 560 sf - scope of work revised to omit mezzanine loading dock and (8) of the (9) grade doors. Revisions include addition of second floor addition of (2) restrooms on the first floor and (2) restrooms on the second floor (2) elevators (3) additional exit stairs for a total of (5) stairs electrical room on first floor revised addition of electrical room on second floor. Revision of building footprint openings on the exterior elevations on north south east and west elevations with additional egress doors and addition of sun shades on the south elevation. Valuation revised from $6, 631, 200 to $17, 825, 000 trash enclosure relocated and revised. (permit cb19-0546) dmc 12/5/1Job Value: $400Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $649Effective Date: 2021-08-23Permit Number: CB19-0395-DBS4
August 23, 2021
Description: Rev2 - delta 49 - added drainage at courtyard revised bioswales revised sloped walkway at north side from exit stair #2. No change in job valuation rev1 - delta 37 - revised sheet g0.0-sa g0.1-sa g1.1-sa c2.1-a c5.1-a l1.01-a l1.1-a thru l1.4-a l2.1-a l2.2-a a1.1-sa a1.2-sa s2.01-a. Revised accessible access at trash enclosure & no parking striping in front. Gate added to patio revised detail for guard rail/fence at patio retaining wall at patio. Added bollards location & detail by trash enclosure. No change in job valuation cb19-0445 - site improvements building a: **revision: building footprint; parking; vehicle access to adjacent property; outdoor amenity space on south side; remove one deck on north side; relocate second deck/patio; relocate transformer. Valuation revised from $2, 578, 000 to $4, 536, 000 relocate trash enclosure (cbcb19-0456)dmc 12/5/19** **revise scope to include grading drainage & utilites. Added valuation $1, 546, 800; plus original scope valuation of $1, 031, Job Value: $592Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop LLCFees: $899Effective Date: 2021-08-23Permit Number: CB19-0445-REV2
August 23, 2021
Description: Rev1 - delta 35 - building a trash enclosure revised to accommodate future tenant improvement compactors front access gate re-aligned additional accessible door in concrete panel install tankless hot wh hot/cold hose bib and electrical for compactors & fixtures. (b. E. P.) (same plan set as cb19-0395-rev2) cb19-0546 - building a - approx. 478 sf conc. Trash enclosure w mtl. Roof. (bldg e P.) **revision: relocate trash enclosure see plans permit cb19-0395 dmc 12/5/19** related permit cb19-0395: building a: proposed scope of work consists of new construction cold shell concrete site cast construction single story and mezzanine - 124, 190 sf occupancy b f1 construction type vb. (bldg/mech/elec/plumbing)Job Value: $616Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $788Effective Date: 2021-08-23Permit Number: CB19-0546-REV1
August 23, 2021
Description: Dbs2 - building a - steel stair shop drawings & cals dbs1 - building a - roof hatch shop drawings & product data building a: **revision: 2story building 1st floor: 64, 280 sf 2nd floor 64, 280 sf total 128, 560 sf - scope of work revised to omit mezzanine loading dock and (8) of the (9) grade doors. Revisions include addition of second floor addition of (2) restrooms on the first floor and (2) restrooms on the second floor (2) elevators (3) additional exit stairs for a total of (5) stairs electrical room on first floor revised addition of electrical room on second floor. Revision of building footprint openings on the exterior elevations on north south east and west elevations with additional egress doors and addition of sun shades on the south elevation. Valuation revised from $6, 631, 200 to $17, 825, 000 trash enclosure relocated and revised. (permit cb19-0546) dmc 12/5/19** proposed scope of work consists of new construction cold shell concrete site cast construction single story anJob Value: $400Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $649Effective Date: 2021-08-23Permit Number: CB19-0395-DBS2
August 23, 2021
Description: Tenant improvement - (bldg a): 110, 000 sq ft non-structural: two-story building to include construction of offices conference rooms break rooms restroom & coffee bar.(bldg/mech/elec/plumbing)Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: Srm ErnstFees: $230,577Effective Date: 2021-08-23Permit Number: CB20-0284
August 23, 2021
Description: Rev3 - delta 50 - arch & struct revision to 2nd floor mechanical penetrations & roof opening. Structural revision at rain water leader locations. Revised sheet g0.1-a a2.2-a a2.3-a s1.1 s1.5 (a/s1.5) a2.2a-1 a2.2 a-2 s2.3 a-1 s2.3 a-2 s4.1 thru s4.3 s5.2 s5.4 s5.6 s6.3. Narrative saved under documents. No change in job valuation. (bldg) rev2 - delta 36 - revised roof elevation & drainage dimensional revision stairs to coordinate design building dbs plans. Added sheet m6.2 & revised m2.3. Revised s2.3 a-1 s2.3 a-2 s3.2 s6.2. Revised p a-1 & p a-2. (b.m.p.) (same plan set as cb19-0546-rev1) *revision-1 4/30/2020 (dm) revisions related to underground scope of work pages g0.0-a g0.1-a e3.1 pa1 pa2 pa3 pa4 pa5 pa6 pa7 pa8 pa9 pa10 underground waste plan 1st fl west waste & vent 1st fl east waste & vent 2nd fl waste & vent 1st and 2nd fl h&c enlargements gas condensate & wmu plan roof plan building a: **revision: 2story building 1st floor: 64, 280 sf 2nd floor 64, 280 sf total 128, 560 sf - Job Value: $550Status: finalType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: South Loop, LLCFees: $807Effective Date: 2021-08-23Permit Number: CB19-0395-REV3
March 1, 2021
Description: Building a - public art: pour concrete footings and mount corten steel sculptures to concrete bases. Intall (4) of (8) from the diatom sculpture series by artist adrien segal (building)Job Value: $42,000Status: finalType: Commercial - full serviceBusiness Name: NA 0Applicant: South Loop 1 LLCFees: $1,055Effective Date: 2021-03-01Permit Number: B21-0110
April 28, 2020
Description: Tenant improvement - (bldg a): 110, 000 sq ft non-structural: two-story building to include construction of offices conference rooms break rooms restroom & coffee bar.(bldg/mech/elec/plumbing)Status: canceledType: Commercial - comboBusiness Name: Oltmans Construction COApplicant: Srm ErnstEffective Date: 2020-04-28Permit Number: CB20-0239
April 10, 2019
Description: Revision per cloud/delta #19 12/3/19: revisions for building design changes: 2 story building in lieu of 1 story + mezz; building footprint revisions. Dmc 12/5/19** site demolition: building a - 6.38 acre site: remove paving; conc; sign; landscaping; cap underground utilities; rough grading and soil improvements. (bldg electrical plumbing.) pln19-0051)Job Value: $1,075,000Status: finalType: Combination building permit otcBusiness Name: Oltmans Construction COApplicant: Srm Ernst Development PartnersFees: $6,620Effective Date: 2019-04-10Permit Number: CB19-0256

Current Ownership

Information about the current owner(s).

Property History

1310 Harbor Bay Pkwy has undefined property events records (listings, deeds, permits, tax, foreclosure, loan).

Property Events

Environment

Environmental factors around 1310 Harbor Bay Pkwy

School Information

Public/private schools serving 1310 Harbor Bay Pkwy

Neighborhood

This property is located in Bay Farm Island, Alameda, CA 94502.

Market Trends

Historical market data near 1310 Harbor Bay Pkwy over selected time period.

Nearby Properties on Harbor Bay Pkwy